Research On Cost Control Of Fixed Assets Investment Capital Construction Project Of Dalian Institute Of Chemical Physics

Posted on:2018-07-27Degree:MasterType:Thesis
Country:ChinaCandidate:B X WuFull Text:PDF
GTID:2382330545455943Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
Along with national economy high speed development and the deepening reform of basic construction project management system,our country construction industry rapid development Engineering construction projects has a higher cost,cycle is long and more uncertain factors,so how to enhance the effectiveness of the project cost control,explore economic benefits from the project should be all units should be studied seriously address the issue,but also we are looking for the key to the development of itself Investment in fixed assets is the state of the nature of investment,in a long phase,compared to the real estate investment and private industry cost control management level is poorer,although constantly improve the management system,has introduced more regulations and rules,but the infrastructure projects and other construction projects of investment in fixed assets compared with functional is outstanding,strong cyclical and return on investment is hard to calculate,and tend to focus on project quality and time limit of project management,implementation process is still in the extensive stage of project management,project cost control is relatively poor,"SanChao" phenomenon is very serious.This article first introduces the development and present status of the project cost control in our country,this paper expounds the principle,process and cost control of project cost control method,and the basic concepts,and project cost control related content,analysis of Dalian Institute of Chemical Physics compound in fixed investment project cost control status and the question of prophase project of investment in fixed assets,put forward by reasonable target cost of the project.the design of the design phase cost control,project construction phase of the actual traveler process control method,and corresponding solutions of establishing professional management team,with actual project as an example,detailed analyze the problems existing in the each stage of the project,put forward the estimates in serious construction standards are inconsistent,visa,alteration,design,material selection,and various problems of the construction of management talent.Of Dalian Institute of Chemical Physics finally through previous projects of fixed assets by analyzing a series of cost control measures are put forward,and enhance the level of cost control management and solve the related problems.Fixed assets of the project cost control is the one of the most important aspects of the project inspection,project management from the national level to control more and more strict,acceptance specification more and more,if you do not meet the good cost control this way,the future may cause controls the disturbance of the project,so it is necessary to strengthen the fixed assets of the project cost control.The purpose of this paper is to analyzes the early stage of the fixed assets investment in infrastructure projects of Dalian Institute of Chemical Physics to cost control management problems,explore the matter in similar construction project cost control of investment in fixed assets ways and means,in order to promote scientific research units at all levels in the national capital construction project cost control of investment in fixed assets of scientific and standardized,for the ascension of fixed assets investment in infrastructure projects put forward scientific advice and also provide reference for other similar projects.
Keywords/Search Tags:fixed assets investment projects, Cost control, Control measures, The control method
PDF Full Text Request
Related items