Font Size: a A A

Research On The Implementation Of Construction Parties In Construction Projects Of Government Procurement

Posted on:2018-10-10Degree:MasterType:Thesis
Country:ChinaCandidate:J X DongFull Text:PDF
GTID:2382330545952456Subject:Engineering
Abstract/Summary:PDF Full Text Request
As the important appraisal method of the construction project of government procurement,the lowest evaluation method nowadays has become an integral part of government procurement in our country and has made a lot of achievements in optimizing government expenditure,building infrastructure and benefiting the people.Government procurement and construction projects to actively choose the lowest bidder of the successful bidder,the construction industry to promote the survival of the fittest,saving the government's construction funds and promote social development.After the development of construction enterprises blowout type,the market competition becomes more and more fierce.In order to survive and develop,some enterprises are desperate to bid for the lowest bid in the government procurement and strive to win the bid.Most highlights the construction side in the signing of the contract implementation aspects.However,after winning the bidding process by the lowest bidding method,the contractor has a weak awareness of contract performance management and arbitrarily changes the contents of the contract.During the contract,the contractor does not attach importance to the contract management,the construction period can not be guaranteed,and the quality of the project can not be guaranteed.Agreed to give up arbitrarily legal acts,etc.,have deviated from their original intention,and finally failed to achieve the desired contract effect,so that the government construction sector miserable.This phenomenon is also becoming more and more prominent.Experts and scholars in the industry are generally concerned about how to ensure the quality of the government construction projects after the successful bidding with the lowest bidding price method and how they can be completed on time.These problems deserve our deep thinking.The research in this paper is of great significance to the construction party's analysis of the factors influencing compliance after the bidding of the lowest bidding method of government procurement is concerned.It is very necessary to pay attention to the compliance of construction parties after winning the bid by the lowest bidding method of government procurement.This paper is mainly divided into six chapters.Firstly,it introduces the research background,purpose and significance of the dissertation as well as the current research situation at home and abroad,main research contents,methods,framework and innovation,related concepts and theories.Through the interpretation of government procurement,construction projects,contract performance of construction contracts and the theoretical knowledge of the lowest evaluation method,combined with the "Government Procurement Law of the People's Republic of China","Bidding Law of the People's Republic of China","Contract Law" and "China People's Republic of China Bidding Law "and other legal documents,the construction of our current government procurement evaluation of the lowest bidding law the status of the implementation of the problem,conducted a more in-depth and systematic research,mainly through the analytic hierarchy process Finally,taking the resettlement housing project in Pingyuan New District as an example,during the implementation process after the successful bidder signed the contract,the government From the establishment of a sound tracking management system,to further improve the legal system,eliminate "yin and yang contract",improve the preparation of the tender documents,the implementation of an effective procurement supervision system management analysis to achieve the desired effect of the project.The research of this thesis,from the perspectives of benefiting future generations and promoting the vigorous social and economic development of the country,provides some feasible methods and suggestions for the study on the compliance issues after the construction party wins the minimum evaluation method for the construction project of government procurement.To promote the healthy development of China's construction market.
Keywords/Search Tags:construction side, government procurement, construction project, implementation, minimum bid price method
PDF Full Text Request
Related items