Font Size: a A A

Study On Optimization Scheme Of Traditional Coal Consolidation Station Of ZHUNDONG Railway Under The Background Of Collecting And Distributing System

Posted on:2018-01-21Degree:MasterType:Thesis
Country:ChinaCandidate:P LuFull Text:PDF
GTID:2382330548468949Subject:Transportation engineering
Abstract/Summary:PDF Full Text Request
Large coal freight station is ordos region an important part of railway heavy-load transportation network.A large number of coal by rail freight station storage,loading,finally to the port or coal enterprises.However,the traditional coal freight station by storage,loading and transported to the birth process such as poor railway loading conditions,low efficiency,slow turnover,and easy to produce dust pollution,at present,actively implement the traditional coal freight station optimization and renovation project,coal railway line is in urgent need of continue to solve the problem.Taking YT.ZHUNDONG belongs to large coal freight railway station-Xiyingzi subset standing for the Angle of view,under the background of transportation,the exploration and research of freight station optimization and transformation plan,designed to optimize the storage,loading and transport way,improve the efficiency of loading group,saving operation time,effectively avoid super slanting load problem,thereby promoting regional energy development strategy,improve the surrounding ecological environment,further implement the transport demand,supply of fountainhead,project planning and reasonable matching,productivity layout and heavy-load transportation planning for the enterprise to provide scientific basis,reduce unnecessary investment.First,this paper expounds the basic concept of coal freight station and the significance,proposed coal freight station in the important role in the development of railway transportation system.Combining ZHUNDONG railway transportation system development present situation,pointed out that seeking Xiyingzi subset the necessity of transportation technology optimization and transformation.Second,in the process of the research on the surrounding coal freight station design idea of storage and transportation way,using standardized templates,similar to area of each station in the early period of the extensive investigation and research,the operation scale,site area,system process,radiation fountainhead,fire control facilities,fully understand and analysis on the investment way,etc,put forward suitable Xiyingzi subset luck station optimization and reconstruction of forward-looking solutions.Finally,based on the characteristics of each scheme,adopt the qualitative and quantitative analysis method,research the constraint conditions of the program and the characteristics of technical and economic index recommendations evaluation and comparison,from the aspects of economy,reliability,social choice has a comparative advantage of optimized retrofit scheme,ZHUNDONG railway transportation system planning for the future and provide decision support.Avoid due to improper choice whole running inventory management difficulties appeared in the process of transportation or loading and poor quality problem,also can avoid because of the excessive pursuit of technological advancement and cause excessive investment.
Keywords/Search Tags:Coal terminal, Collection and Distribution, ZHUNDONG Railway, Program, Decision Support
PDF Full Text Request
Related items