| Nowadays,the smoggy environment is a serious threat to people’s health,especially to students in school.The purifying fresh air system can bring fresh and clean air into the room and discharge the polluted air out of the room,thus providing a clean and comfortable atmosphere for the teachers and students.However,there are many problems in the management of the company,which directly restricts the further development of many clean industry companies.How to do a better job of clean project management has become a clean industry companies to solve the problem.The research content of this paper includes the study of the 21 st century international school purification fresh air system project from the design to the construction,to the project completion test,and finally the implementation effect is evaluated.With Shijiazhuang Aoxiang Pharmaceutical Engineering Co.Ltd.as the design and construction unit,under the current research status of the complete design norm of the school purifying fresh air system,The characteristics of each building structure of the international school in the first century are analyzed,and the design of the purifying fresh air system for the school is designed with the help of the radial air supply technology.This design can provide reliable design specifications for the future school purifying fresh air system project and saving design time.Analyzed problems in the clean of the company,and optimize the quality,cost and construction period in the project construction phase,to achieve high quality,short duration and low cost of the project.The project passed technical inspection,reduce the indoor air PM2.5,CO2 content effectively,creat a quality learning environment with good environmental and social benefits. |