| XX city underground pipe gallery project is a key project of infrastructure construction in recent years the city of XX,the project is in the background of national infrastructure construction,is also in response to the "The Belt and Road" strategic landing project.The construction of the underground comprehensive pipe Corridor Project in XX city can thoroughly solve the problem of environmental pollution caused by the extensive construction environment in XX city because of the repeated opening,burying and excavating of the local pipeline for updating equipment and facilities.The dry branch line and the branch line comprehensive pipe gallery in the XX city underground comprehensive Corridor project are about 132.25 kilometers,of which the total length of the branch corridor is 84.16 kilometers,the length of the branch corridor is 48.09 kilometers.The total mileage of the cable line corridor is 365 kilometers in the near future.Through the previous investigation and analysis,the comprehensive pipe Corridor project of the XX city is not only a general worker.The general risk attribute of the project construction project also has its own risk characteristics,and the project needs tight schedule,the construction difficulty is great,the coordination management between the projects is difficult,its risk is far greater than the other similar projects,and how to effectively solve the potential investment risk of the project is the project developers and managers face.A huge challenge,at this point,in order to effectively control the investment risk of XX city underground comprehensive pipe Corridor project,this paper combines the research of the XX underground comprehensive pipe Corridor project several times,according to the project’s own risk characteristics,the research on the risk of the underground comprehensive pipe Corridor Project in XX City,the main contents of the research include:(1)introduction and risk analysis of underground pipe gallery project in XX city.First,the relevant contents of the underground comprehensive pipe Corridor project are systematically combed,the construction scheme of the typical trunk corridor and the construction scheme of thetypical branch corridor are analyzed.The characteristics of the XX underground comprehensive pipe corridor are summarized,and the risk of the completion,economic and policy aspects of the underground comprehensive pipe Corridor Project in XX city is analyzed,which is X The risk management of X underground pipe gallery construction project provides the basis for risk analysis.(2)investment risk analysis of XX city underground pipe gallery project based on credibility measure theory.According to the general principle of risk analysis and the risk characteristics of underground pipe Corridor project,the investment risk of underground pipe Corridor project is summarized,and five kinds of risk of underground comprehensive Corridor project are identified.Based on the results of risk analysis,the risk assessment index system of XX city underground comprehensive pipe Corridor project is constructed,and the selection is taken into consideration.A risk assessment model is constructed based on credibility measure theory.The quantification,evaluation criteria and process of index system are analyzed one by one.(3)investment risk control strategy of XX underground complex pipe gallery project.Through the analysis of the results of the risk analysis factors of the underground comprehensive pipe Corridor Project in XX city and the role positioning of the underground comprehensive pipe corridor in XX City,the risk coping strategies are deeply analyzed,and the main risk coping styles and countermeasures are analyzed in detail. |