Programme Of Implementing Measures And Formulate Plan For Construction Period Target In DP Development Project

Posted on:2019-11-26Degree:MasterType:Thesis
Country:ChinaCandidate:F R LiuFull Text:PDF
GTID:2392330599975403Subject:Project management
Abstract/Summary:PDF Full Text Request
In order to pursue profits,the project development enterprises hope to complete the construction task as soon as possible and take all means to promote the early realization of the goal of the construction period.Some development projects are forced to rush construction period,resulting in the security measures can not be guaranteed,coupled with the construction period target to achieve the method error,there have been repeated safety incidents.The determination and Realization of construction period target is a scientific management work,under the guidance of scientific theory,in accordance with the process of target management of construction period,standardized management and meticulous organization of construction are needed to ensure the smooth realization of the target of construction period.The theory of target management of project construction period tells us that the target management of project construction period is not only necessary,but also feasible.But the realization of the target of construction period must depend on scientific ways and methods.Summarize the way to achieve the goal of the project construction period,mainly include:pre-construction investigation,establish the scope of the project construction,compile the project construction period arrangement plan,analyze and determine the project construction period goal and implement the project construction period arrangement planDP development project is located in Kaihua County,Zhejiang Province.It is a high-grade housing project developed to meet the housing needs of residents in Kaihua County.The project covers an area of 49213 square meters,with a total floor area of 35082 square meters.The development and construction include a high-rise building Jinxiu Building(15 floors),four multi-storey building Yuping Building,Fengming Building,Wenfeng Building and Chunxuan Building(all 6 floors),as well as service center(three floors),distribution room,roads,greening and other supporting projects.The project construction period is short,and the requirement is high,and strict requirements for target management in construction period are put forwardThis research is under the guidance of the theory of project construction period target management,in-depth study of DP development projects,according to the realization of the construction period target analysis in turn.First,carry out pre construction investigation and fully grasp all kinds of information related to construction period;the construction range of DP development project is analyzed by WBS,NPT and other construction period management techniques,and a reasonable construction period arrangement plan is worked out,and the construction period target is defined;From the aspects of organization,system and technology,this paper studies the concrete measures for implementing the construction period target realization plan,and checks the actual construction period of DP development project,corrects the deviation of the construction period seriously,revises and optimizes the construction period arrangement plan through the application of technical methods such as forward line method,so as to ensure the real construction period arrangement plan implementation,to ensure that the construction period of DP development projects is achieved on schedule,and to increase the economic benefits of development enterprises and construction enterprises.The results show that as long as the correct theory of target management of construction period is adhered to,the reasonable way to realize the target of construction period is implemented,use a variety of scientific construction period management techniques,conscientiously implement the construction schedule arrangement plan,find problems and rectify them in time,It is possible to realize the construction period goal of the development project.
Keywords/Search Tags:Construction period target, Implementation method, WBS, NPT, Front line
PDF Full Text Request
Related items