Font Size: a A A

Production Scheduling System Research And Application For Building Materials And Equipment Manufacturing Enterprise

Posted on:2017-06-05Degree:MasterType:Thesis
Country:ChinaCandidate:N WangFull Text:PDF
GTID:2439330566952697Subject:Mechanical engineering
Abstract/Summary:PDF Full Text Request
The production cost of the product is increasing with the rapid development of the economy.The building materials and equipment manufacturing enterprises are facing tremendous pressure.The building materials and equipment enterprises have to solve the problem that how to improve the level of production,how to reduce production costand how to improve the core competitiveness of the enterprises.Production scheduling is not only the core of the building materials and equipment manufacturing enterprise's production management,but also the most complicated and the most difficult part of the entire business management.A good scheduling scheme is very important to improve the management level of the enterprise and enhance the market competitiveness of enterprises.On the basis of this,the articlestudies on production scheduling for building materials and equipment manufacturing enterprises with the building materials and equipment manufacturing enterprises as the research object.The main research contents are as follows:(1)Analysis the development status of the building materials and equipment manufacturing enterprises,describe the problems that exist inproduction management of the building materials and equipment manufacturing enterprises,study the production scheduling theory and review the domestic and foreignresearch situationin production scheduling problem.(2)After the analysis of the building materials and equipment manufacturingenterprises' business process and production scheduling process,it points out that the application of production management system is significant to improve the enterprise management level and the core competitiveness of enterprises.At the same time for the problem that enterprise encountered in the real scheduling,the paper puts forward the corresponding suggestionsfrom lower costs,shorten working hours,improving the utilization rate of equipment with the guidance of lean production.(3)For the building materials and equipment manufacturing enterprises' production scheduling problem that is underlarge,single,small batch mode and driven by order,according to the actual business process and characteristics of building materials and equipment manufacturing enterprise,establish a production scheduling model considering the total production time and the total production cost.(4)The papers do some promotions on traditional bee algorithmby increasing the initial population and foreign population quality,bringing in the selection operator,theadaptation operator and the cataclysm operator.Effectively solve the problem that traditional bee algorithmpremature convergence and easily fall into the local optimal solution.Improve the practicability of the algorithm,and use the improved algorithm to solve the bee production scheduling model.Through simulation comparison,verify the algorithm is effective.(5)Combined with the building materials and equipment manufacturing enterprises' actual business process and characteristics of its production and management,design and developthe building materials and equipment manufacturing enterprise's production management system.Thesystem,as an important part of enterprise digital manufacturing platform,has been in to a good using in the enterprise.Through the acceptance and get the application of the computer software copyright certificate.
Keywords/Search Tags:Building materials and equipment manufacturing, production scheduling, improved bee algorithm, production management system
PDF Full Text Request
Related items