Font Size: a A A

The Research On Project Plan And Management Of Credit Card Approval System Of Guangdong SDNS Bank

Posted on:2020-04-17Degree:MasterType:Thesis
Country:ChinaCandidate:Y P GuoFull Text:PDF
GTID:2439330575479510Subject:Engineering
Abstract/Summary:PDF Full Text Request
With the deepening of financial system reform,the operation and development of commercial banks are facing unprecedented pressure of transformation.Guangdong SDNS Bank actively responds to the transformation,and continuously increases the investment of retail sector,especially the core product credit card business.In order to solve various problems in the development of credit card business,SDNS Bank promotes the management level of credit card business by actively introducing advanced systems and increasing financial technology investment.This paper is based on the above background,through the SDNS Bank to build a credit card approval system for case analysis,based on the latest knowledge system of PMI PMBOK project management,the credit card approval system project planning and management are studied.Firstly,the paper introduces the background of credit card business of SDNS Bank,finds out the problems that restrict the development of credit card business,and finds the direction to change according to the current situation of the same industry,that is,to develop advanced credit card approval system.At the same time,it puts forward the application of the latest knowledge system of PMBOK project management in the development of the system to study the project;secondly,it introduces the relevant theoretical system and knowledge of project management.The meaning,characteristics and functions of project management,project management process and project management system are summarized.Then,the specific content of this project is discussed in depth.Starting from the problem,the paper systematically analyses the various problems existing in the business,and deduces the development strategy of the system project(resolving various problems)based on the problem orientation,and formulates the project according to the project strategy.On the basis of the above,the article enters into the project management and implementation,through effective management means and implementation strategies to ensure the effective promotion and smooth completion of the project.Finally,it evaluates the final effect of the project after putting into operation,and gets the conclusion of solving the problem.The full text advances in accordance with the logic of raising,analyzing and solving problems.Combining with the development process of SDNS Bank Credit Card Examination and Approval System,this paper determines the project plan from the point of view of project structure,scope and project establishment,and discusses several processes in knowledge fields such as time management,cost management,etc.Finally,through the successful launch of the project and the reasonable control of the cost-benefit achieved in the later period,the effective promotion of internal management and the rapid development of business,etc.The conclusion of this paper is a good demonstration and guidance for SDNS bank to introduce such projects to promote internal management level and business development in the future.
Keywords/Search Tags:Project strategy, project plan, project management, project implementation
PDF Full Text Request
Related items