Font Size: a A A

Study On Improvement Of Construction Of Drilling Platform

Posted on:2017-12-28Degree:MasterType:Thesis
Country:ChinaCandidate:J LiFull Text:PDF
GTID:2439330596462095Subject:Industrial engineering
Abstract/Summary:PDF Full Text Request
The second half of the year,the shipyard is in full throttle.Low cost,short delivery period has become the latest project construction requirements.From the point of view of the internal environment,the general situation of the company in 2015 as the company safety management index,project progress index,cost index,performance index,hand-held orders,inventory control Physical indicators are on the red light,2016 will be more difficult.Therefore,to ensure the smooth completion of the project in hand,it is necessary to seriously explore and summarize the method to improve the efficiency of the project construction.Lean production is the advanced management mode and universally recognized today,whether in manufacturing or services in the study,the application of lean management.Some of the world famous enterprises in the study,practical application of lean production process has gradually formed its own lean management system.The company should change to the internal and external environment,to enhance the manufacturing ability a suitable,urgently needs to build its own lean management system.How to develop a scientific and reasonable plan to promote the implementation of lean production,effectively solve the problems in the promotion of lean production,lean production management system and gradually establish a continuous improvement can be accumulated,eventually forming the core competitiveness of enterprises.Based on the lean production theory,depends on the construction of the enterprise lean production management system,put forward a series of corresponding measures.These studies are supplement and improvement in the implementation strategy of the enterprise current lean production,it also has important reference and guidance significance to the whole industry.
Keywords/Search Tags:lean production, drilling platform, Construction period, plan management
PDF Full Text Request
Related items