Research On Project Progress Management Of XX Company Credit Card Merchant Transaction System

Posted on:2023-02-03Degree:MasterType:Thesis
Country:ChinaCandidate:C F HuFull Text:PDF
GTID:2569306914958769Subject:Project management
Abstract/Summary:PDF Full Text Request
In the era when traditional urban banks keep up with the changes of Internet economy,in order to make their products better survive in the tide of the Internet era,it is necessary to constantly improve and optimize the management of software development projects,so as to better adapt to the update and iteration of project management in the field of software development.In this paper,the application of project schedule management in the credit card merchant transaction system project is taken as a case study,combined with the actual situation of the project,the credit card merchant transaction system project is analyzed.According to the theory and technology of project schedule management,a perfect schedule is developed,and combined with the schedule management control,the plan is optimized and controlled.First of all,starting from the research background and significance of the paper,the basic situation of project schedule management research at home and abroad is described,and the content and methods suitable for the project schedule management research are selected according to the domestic research situation.After that,the theory and technology of schedule management are elaborated to guarantee the support of basic theory.Then it describes the basic situation of the company and the project,analyzes and studies the project schedule from the perspective of project schedule management,and sorts out the problems existing in the project.After analyzing the problems studied,combined with the actual situation of the project and the theory and technology of schedule management,a complete schedule plan was made for the project.After that,through the theory of schedule management control and work experience,appropriate optimization and control means are made for schedule plan,and good results have been achieved.
Keywords/Search Tags:merchant transaction system, project management, progress management
PDF Full Text Request
Related items