Font Size: a A A

Yan Chang Oil CK Refinery Installation Project Schedule Management Research

Posted on:2015-02-09Degree:MasterType:Thesis
Country:ChinaCandidate:Z LiuFull Text:PDF
GTID:2181330467988569Subject:Project management
Abstract/Summary:PDF Full Text Request
The project schedule management is a key link in the process of the project succeeds, butthe traditional project management is inefficient, partial, far from the requirements of modernproject management, project tasks in the actual estimate is too long, the situation of the projectperiod extended, how to effectively improve the traditional project schedule management,became a hot issue in the research of project management in recent years. Critical chaintechnology in project schedule management begin to use, and can solve the disadvantages oftraditional project schedule problem.Based on the extension of the oil refinery project as the research object, CK first focuseson the related concept, the project schedule management content and method of projectprogress management, the shortage of the traditional plan method and key technology, thefeasibility of the critical chain technology’s contribution to the oil project progressmanagement, on the basis of this analysis, the research to extend the oil refinery CK status quoand main problems of project management progress, in the article in the fourth chapteranalyzes the extension of the oil refinery project schedule of CK and control, the concretecontent includes: the principle of the project schedule management, critical chain technologymain thoughts, basic hypothesis, calculation and determination of buffer time and so on.Finally put forward to extend the oil refinery CK critical chain technology application ofprogress control countermeasures: strengthen refining project construction organization,strengthen the construction of resource circulation pipe, strengthen refining project changemanagement, strengthen the refining project schedule management personnel training. Tofinally summarizes the full text and puts forward prospect is forecasted. This article used theliterature analysis, empirical analysis and normative analysis method, comparative analysismethod, a multidisciplinary research methods.
Keywords/Search Tags:Extension of the oil refinery CK, The project schedule, managementresearch
PDF Full Text Request
Related items