Font Size: a A A

Denitration Project Management Difficulties And Countermeasures Analysis

Posted on:2016-11-07Degree:MasterType:Thesis
Country:ChinaCandidate:Y T ChenFull Text:PDF
GTID:2181330467994344Subject:Project management
Abstract/Summary:PDF Full Text Request
For a long time, China’s energy structure is relatively simple, coal, natural gas,petroleum based. Various types of boilers, furnaces and other equipment, the use ofcoal, natural gas, oil and other fuels process, will produce large amounts of carbondioxide, sulfur dioxide, nitrogen oxides and other air pollutants, including airpollution produced by coal-fired boiler is most serious is China The main sources ofair pollution. According to statistics, more than eighty percent of China’s power fuelmore than70%of chemical fuel, more than60%of chemical raw materials and morethan eighty percent of the heat generated by burning coal. In a very long period oftime, this situation will not change much.Coal-fired power plants are major emitters of soot, sulfur dioxide, nitrogenoxides and other major air pollutants, the implementation of GB13223-2003"thermalpower plant air pollutant emission standards", which greatly promoted the control ofatmospheric emissions of coal-fired power plants to protect the environment, topromote technological progress and environmental protection industries.In recent years, the state formulated a series of relevant laws and regulations,planning, technology policy, coal-fired power plants as the representative of large airpollution emission standards put forward higher requirements.In recent years, China vigorously promote environmental protection, butenvironmental situation is still very grim, with coal as the main energy of thestructure leads to the total emissions of atmospheric pollutants remain high, potentialenvironmental problems continue to emerge, the atmosphere in some areas pollutionproblem is more obvious, such as the Pearl River Delta, Yangtze River Delta, Beijing,Tianjin and other regional metropolitan areas showing the regional concentration ofatmospheric pollution phenomenon growing pollution problem caused by nitrogen oxide masses of attention, the type of acid rain from sulfuric acid has to type sulfuricacid and nitric acid complex changes.GB13223-2011"thermal power plant air pollutant emission standards", tocontrol sulfur dioxide, soot, nitrogen oxides, and mercury and its compounds in thefour pollutants, standards continues to increase."National" five "emission reduction plan"(draft) on atmospheric pollutioncontrol requirements made clear: a new coal-fired units must be installeddesulfurization and denitration equipment to complete the50.56million kilowatts ofdesulfurization equipment running coal-fired units The supporting construction of42.67million kilowatts compliance cannot run stable desulfurization unittransformation, completed70million kilowatts of low NOx combustiontransformation of coal-fired units and400million kilowatts coal-fired unitsdenitration transformation.With the Chinese government and people attach importance to environmentalprotection and improve the degree of desulfurization and denitration industry inrecent years, showing rapid growth. Denitration engineering company also will havemushroomed rapidly increase, compared to an increase in the number of expansionand corporate markets, denitration engineering project management company alsobegan to appear all kinds of problems.In order to investigate enhance denitration project management approach, theneed to constantly ponder the difficulties denitration project management where theneed to find a path to break through these difficulties, what measures can be achievedusing the denitration project management can be standardized and efficient operation.This article aims to analyze the flue gas denitrification project managementdifficulties, and propose appropriate solutions, the company will do for flue gasdenitrification governance has a certain theoretical value and practical significance.
Keywords/Search Tags:Denitration engineering, project management, construction preparation, construction of process control
PDF Full Text Request
Related items