Font Size: a A A

Research On Cost Management Of Continuous Casting Machinery Maintenance Area Construction Project In Zhan Jiang

Posted on:2015-08-23Degree:MasterType:Thesis
Country:ChinaCandidate:R J LiFull Text:PDF
GTID:2311330512470979Subject:Project management
Abstract/Summary:PDF Full Text Request
Building first-class iron&steel companies in ZhanJiang is an important step to achieve Baosteel's development in future,and it have a huge influence on iron industry.As a branch,Zhanjiang continuous-casting machinery maintenance area construction project is mainly responsible for rending the entire drive roll and maintenance segment in continuous-casting plant.It is an importance of continuous-casting plant which to maintain the smooth running protection.Through this research project costs,effective cost management measures taken for the entire Zhanjiang project and steel industries have a reference.The research of Continuous-casting machinery maintenance area construction project cost is important for it successfully put into operation.Using of knowledge management,choosing the right project cost control measures is to ensure that the cost of construction machinery maintenance area controlled necessary means.Base on use of basic technology development and management personnel,the rational use of construction funds,so that the actual cost of the project does not exceed the project budget to ensure the project on time,quality and cost-effective way to achieve the stated objectives.Accurate project cost estimate and control is the guarantee of Machinery maintenance Area Construction Project construction cost controllable necessary means.In the full use of technology developers and managers on the basis of the rational use of funds,construction,the project does not exceed the actual cost of the project budget,ensure on time,according to quality,economy,high efficiency to achieve the stated objectives.Based on the mechanical maintenance area construction project cost studies,combined with the work of the construction phase of the project.Getting cost estimates and cost estimates,find a gap of the estimated budget and taking a child-depth study of the various types of costs.Find cost-appropriate methods and measures to ensure that the cost of the project cost control within budget in factor analysis of the reasons for the project.This paper combines the largest steel project in Zhanjiang has a strong theoretical and practical significance.It have a promotional significance for the entire project and the whole steel industry.
Keywords/Search Tags:The zhanjiang iron project, cost estimating, cost budgeting, cost control
PDF Full Text Request
Related items