Z22 blast furnace reconstruction project is relying on the Shandong iron and Steel Group coordinated the province’s steel management platform under control,reasonable utilization of Project Manager Department of human,materialand mechanical equipment and other existing resources,to achieve efficient operation of blast furnace reconstruction project cost management,at the same time the project cost management of the pilot project,to eliminate the difficultiesof construction cost management enterprises in the process of project management,so that the effective operation of cost management,in order tosolve the bottleneck problem of cost management in project management.Give full play to forecast,things in control,after the analysis of the function,the dynamic control of the whole process,a full range of engineering projects cost,ensuring to realize the maximization of profit,provide a reference for the same type of construction project cost management.Estimation,accurate project cost budget and control is necessary to ensure the company modified Z22 blast furnace construction cost is controllable expansion project.On the basis of making full use of the project department management business knowledge and experience,reasonable planning cost estimate,budgetand other means of control,saves the project construction cost,the project does not exceed the actual cost of the project budget,ensure on time,according to quality,economic efficiency,to realize the established target.This paper to Shandong Z22 company changed the whole process of blast furnace the cost of expansion projects are accurately estimate and budget,according to the project construction in various stages of work,to evaluate thecost,the use of earned value analysis to actually produce cost tracking and monitoring,on the main problems of the project cost control process,analysis of project construction each stage of cost data,and carries on the effective cost control of unfinished projects,so as to control the cost within the budget,that the measures and methods for the cost control of the project. |