Research On Schedule Management Of Wastewater Treatment Station Project Of Waste Incineration Power Plant Of Company S

Posted on:2019-09-19Degree:MasterType:Thesis
Country:ChinaCandidate:X Z GuFull Text:PDF
GTID:2381330590978794Subject:Project management
Abstract/Summary:PDF Full Text Request
Today,with the rapid development of urbanization in China,the amount of urban waste generated has also increased substantially.The “ecological civilization construction” and “environmental governance” in the national “13th Five-Year Plan” have become major issues to be solved urgently.Waste incineration is the most appropriate and reliable way to solve the garbage problem in China because of its technical characteristics of “reduction,harmlessness and resource utilization”.However,in the construction of waste incineration power plants,priority should also be given to solving the problem of disposal of landfill leachate.Because the chemical oxygen demand of landfill leachate,ammonia and other toxic and harmful substances are heavy,harmful,and difficult to degrade,they cannot be directly sent to urban sewage treatment plants for disposal.It is necessary to construct a sewage treatment station for each waste incineration plant to concentrate on landfill leachate.Dispose of.At present,although there are some project management studies in the municipal sewage treatment plant,there are few studies on the construction of the landfill leachate sewage treatment station project,especially the progress management research is still lacking,but in the actual waste incineration plant.In the construction of the sewage treatment station,as an important supporting environmental protection facility,it should be “simultaneously designed,constructed and put into operation at the same time” with the main incineration plant.It must be consistent with the progress of the main body.This requires that the sewage treatment station should adopt advanced technology during the construction process.The project management mode changes the nonprofessional and crude management attitude.Under the quality of the project construction,the company will timely and effectively dispose of the leachate in the main plant area to ensure the normal operation of the waste incineration plant.This paper takes the new project of S Company Waste Incineration Power Plant Wastewater Treatment Station as the research object.On the basis of a brief introduction to the project management research theory,it focuses on the related concepts of project schedule management and project schedule,and introduces the progress management and Theories and methods of control.The paper first introduces the background and engineering overview of the S company sewage treatment station project,and analyzes the key and difficult problems that may be encountered during the project construction process,and then applies the project scope management theory and network planning technology to the project schedule.The preparation,analysis of the factors affecting the progress,and the preparation of the construction organization plan and safeguard measures,fully exerted the application of project progress management in this project for a variety of specific issues.In the actual construction process of the project,the corresponding programs and measures are implemented to realize the scientific management and control of the project progress,which reflects the important role played by the progress management system knowledge in the project construction as scheduled.
Keywords/Search Tags:Waste-To-Energy, Sewage Treatment, Project Management, Schedule Management, Leachate
PDF Full Text Request
Related items