Research On Cost Control Of Wastewater Treatment Project In X Company

Posted on:2022-03-25Degree:MasterType:Thesis
Country:ChinaCandidate:B XuFull Text:PDF
GTID:2531306917481894Subject:Project management
Abstract/Summary:PDF Full Text Request
With the rapid development of China’s economy,the environmental problems that have never been paid attention to before are gradually highlighted.The construction of sewage treatment plant has become one of the effective measures to protect water resources in China.However,how to control the cost,improve the economic benefits of enterprises and save social resources has become a key issue during the construction of new projects.Project cost control is a whole process,all-weather,all-round control process.It makes reasonable budget and plan for each stage of the project according to the theory,analyzes and finds problems in the process of project implementation,compares the deviation between the actual and the plan,takes corresponding measures to effectively correct,achieves the rectification goal,and finally ensures the realization of the project investment goal as expected.In this article,through understanding the relevant theory of project control,target cost comparative analysis method,project cost analysis table method,bar chart method and other cost control methods and steps,the characteristics of different stages of the actual project and the existing problems,analyzes and summarizes the control process and corresponding measures,laying a theoretical foundation for the research.Firstly,it analyzes the relevant background of X Company and the actual situation of X Company’s sewage treatment plant,forecasts the input target cost of each stage and formulates the emergency plan.Secondly,the deviation is analyzed according to the actual data,and the reasons and corresponding risks are analyzed according to the characteristics of different stages.Finally,according to the causes and risks of deviation,reasonable use of rectification methods,formulate rectification plan,and put forward corresponding safeguard measures to solve the problems.So as to improve the profit margin of X Company in the project and subsequent projects.This article puts forward constructive improvement suggestions on the cost management problems encountered in the construction process of X Company’s sewage treatment project,which is helpful to achieve the cost target and improve its management level.It provides a management model for the company to build the same type of sewage treatment project in the future,and also can bring practical reference for other enterprises,which is conducive to the science of water treatment industry Reasonable and normative development.
Keywords/Search Tags:project cost, sewage treatment, cost control
PDF Full Text Request
Related items