Study On Cost Control Of EPC Project Of N Town Wastewater Treatment

Posted on:2024-03-21Degree:MasterType:Thesis
Country:ChinaCandidate:N ZhangFull Text:PDF
GTID:2531307148953409Subject:Project management
Abstract/Summary:PDF Full Text Request
With the rapid development of economy and society and the remarkable improvement of people’s material life,wastewater has gradually become an important factor that restricts the development of economy and society and affects the ecological environment,therefore,the development of sewage treatment projects show a growing trend.With the survival of the fittest in the market economy,EPC project has gradually entered the public field of vision and gradually become a new mainstream model of engineering construction.Through the analysis of the current situation of EPC project construction,it is found that cost control has been the key link restricting the progress of EPC project and the profits of enterprises,in particular,the general contractor’s lack of professional knowledge,the project in the actual operation of the various stakeholders link up disjointed reasons,leading to the project difficult to achieve the desired results.Based on the research status of cost management and cost management of EPC mode at home and abroad,this paper analyzes the advantages of EPC mode in cost management and the deficiencies in cost control of current projects.At the same time,the related theory and research methods,mainly related to the cost management theory,EPC project mode,summed up the sewage treatment EPC project in the cost management of the unique.The main content of the study is to select N Town Sewage Treatment EPC project as the specific research object,on the basis of detailed introduction of the project,combined with the project design,procurement,construction of each link cost control status quo,by comparing and analyzing the characteristics of each link,the paper comes to the conclusion that there are 11 factors influencing the cost control of the general contractor.After Factor Analysis,a questionnaire survey is carried out by integrating all kinds of data,and factor analysis is carried out according to the results of experts’ ratings,and four key factors affecting the total cost of the general contractor are obtained,the main problems in the process of project cost control are defined as“Making design plan”,“Communication effectiveness between design and related parties”,“Selecting the right supplier” and“Quality cost”.Combined with the key factors of the existing problems in the proposed supporting recommendations.For example: optimize the overall design and construction program,strengthen the implementation of the program and construction of the effective link between the various links,select business ability and comprehensive quality of the dominant suppliers,and improve the quality of construction materials to improve the cost-effective.In his report to the 19 th Party Congress,Xi pointed out that in order to maintain harmonious coexistence between man and nature,it is necessary to establish and practice the concept that green waters and mountains are mountains of gold and silver,and adhere to the basic state policy of resource conservation and environmental protection.In the economic development and daily life of residents,wastewater has been an important factor restricting the impact of the ecological environment,so in recent years,the development of wastewater treatment projects show a growing trend.And the vast majority of sewage treatment projects gradually began to adopt the EPC General Contract Project Mode(hereinafter referred to as EPC project),therefore,EPC project began to enter the public’s field of vision and gradually become a new mainstream model of engineering construction.
Keywords/Search Tags:Sewage Treatment, EPC Project, Cost control, Key Factors
PDF Full Text Request
Related items