Font Size: a A A

GIS-based Open-pit Mine Production Scheduling System For Monitoring The Applied Research

Posted on:2011-01-17Degree:MasterType:Thesis
Country:ChinaCandidate:X ZhaoFull Text:PDF
GTID:2120360302990216Subject:Computer software and theory
Abstract/Summary:PDF Full Text Request
Open-pit mine production scheduling system core technology includes " a core , a prerequisite for an assurance that a target " in four areas. (That the optimal scheduling is the core of the system accurately the location and status of equipment is a prerequisite for optimal scheduling, fast and reliable communication is to ensure stable operation of the system, on-site use and effectiveness of the system to achieve the goal.) Also the paper introduced the realization device monitoring the location and status display.In this paper, the open-pit mine production scheduling system, the overall structure and the actual needs of, based on open source GIS technology combined with GPS positioning technology, focus on equipment operation to achieve real-time monitoring and management. To this end this paper on the monitoring side software business logic and modes of application in-depth analysis, based on GIS in mind, the overall technical framework of the system design and spatial data models. Through the map control and data binding layer, and the road network to achieve real-time updates, using open-source map engine SharpMap developed the corresponding monitoring software. The Huaneng Yimin Coal and Electricity Company in the open pit mine production scheduling system automation applications to good effect.
Keywords/Search Tags:Production scheduling system, GIS(Geographical Information System) Technology, Real-time monitoring, Open Source, SharpMap, MapGIS Server
PDF Full Text Request
Related items