Font Size: a A A

Study On Potential Of Increasing Temperature In Hot Stove At 1BF In JISCO

Posted on:2003-07-19Degree:MasterType:Thesis
Country:ChinaCandidate:K S SunFull Text:PDF
GTID:2121360092495324Subject:Metallurgical engineering
Abstract/Summary:
In order to achieve higher temperatures and to obtain the aims of increased iron amount and saved cokes in ironmaking process, the problem on technique of hot-blast furnace is still topics that blast furnace workers concerning.This thesis investigates the problems from practice of production of the hot-blast furnace No.l in Jisco,a primitive conclusion of performance efficiency of this hot--blast furnace has been drawn and the technical path to achive higher temperatures of hot-blast at the Jisco has been paved on the basis of in-depth research and careful measurement technical data on the spot.At the same time a predictive analysis of the hot-blast stove with ball-type used medium 380m3 blast furnace in construction by a subcompang of Hong Yang. Shan Xi has been given.
Keywords/Search Tags:hot stove, blast temperature, thermal energy, investigation
Related items