Font Size: a A A

Study On Potential Of Increasing Temperature In Hot Stove At 1BF In JISCO

Posted on:2003-07-19Degree:MasterType:Thesis
Country:ChinaCandidate:K S SunFull Text:PDF
GTID:2121360092495324Subject:Metallurgical engineering
Abstract/Summary:PDF Full Text Request
In order to achieve higher temperatures and to obtain the aims of increased iron amount and saved cokes in ironmaking process, the problem on technique of hot-blast furnace is still topics that blast furnace workers concerning.This thesis investigates the problems from practice of production of the hot-blast furnace No.l in Jisco,a primitive conclusion of performance efficiency of this hot--blast furnace has been drawn and the technical path to achive higher temperatures of hot-blast at the Jisco has been paved on the basis of in-depth research and careful measurement technical data on the spot.At the same time a predictive analysis of the hot-blast stove with ball-type used medium 380m3 blast furnace in construction by a subcompang of Hong Yang. Shan Xi has been given.
Keywords/Search Tags:hot stove, blast temperature, thermal energy, investigation
PDF Full Text Request
Related items