Font Size: a A A

The Max Economic Profit Analysis Of Sintering And Refining Of Vanadic And Titanic Ore And Common Ore In Chengde I&S Co.

Posted on:2006-02-18Degree:MasterType:Thesis
Country:ChinaCandidate:Y K YanFull Text:PDF
GTID:2121360155971210Subject:Iron and steel metallurgy
Abstract/Summary:PDF Full Text Request
Chengde I&S Co. not only refines the common ore, but also the vanadic and titanicore and not only produces the common carbon steel, but also low alloy steel. So ChengdeI&S Co.'s profit is mainly decided by production costs of the common carbon steel andlowalloy steel, and by the change of the vanadic slag's selling price and different crudematerials and fuels and powers'price. This changes the costs and profit of the common oreand vanadic and titanic ore. The rate of the common ore and vanadic and titanic orechanges with the profit's change. So, according to the change of produce costs and themarket price, it needs to find the best rate of the common ore and vanadic and titanic oreand adjust the rate in time for getting the best profit.According to the produce data from Dec, 2001 to Oct, 2002 of Chengde I&S Co. ,thesintering machine's utilized coefficient of common sinter is 112.8% of vanadic sinter. Theblast furnace's utilized coefficient of common melted iron is 109.6% of vanadic meltediron. The power consumption of common melted iron is 105.4% of vanadic melted iron.The steel yield of common steel is 118.0% of vanadic steel.Through gathering the operation data of job site, as the program language, VisualBasic6.0 is used to exploit the count software. During the process of practice apply, thecount software is credible and accurate and reaches the require of design and practiceoperation personnel. The count software has many functions, for example, count, open thedata base, modify and save the data, alternative save and copy the data base, print the countresult, drawing, store and so on.According to the price system in Sep, 2002 of Chengde I&S Co. If Chengde I&S Co.produce the common carbon steel completely, it will get the best profit when the rate of thevanadic steel is controlled by 7.7%. Corresponding, the rate of vanadic melted iron andvanadic sinter is controlled by 7.9% and 7.5% separately. If Chengde I&S Co. produce thelow alloy steel completely, it will get the best profit when the rate of the vanadic steel iscontrolled by 6.6%. Corresponding, the rate of vanadic melted iron and vanadic sinter iscontrolled by 6.8% and 6.4% separately.
Keywords/Search Tags:Chengde I&S Co., sinter, melted iron, steel
PDF Full Text Request
Related items