Font Size: a A A

Study Of The New Process For Collecting And Extracting Gallium From The ISP Slag Produced At Shaoguan Smelter

Posted on:2005-05-03Degree:MasterType:Thesis
Country:ChinaCandidate:Y H LiFull Text:PDF
GTID:2121360182468430Subject:Non-ferrous metallurgy
Abstract/Summary:PDF Full Text Request
150,000 tonnes of granulated slag is produced annually from the slag fuming furnace at Shaoguan Smelter , which contains about 30—40 tonnes of Ga and 40,000 tonnes of Fe . The total amount of granulated slag stored until now is approximately up to 2,000,000 tonnes , which contains about 400—500 tonnes of Ga . The value of Ga content is about more than a billion RMB Yuan based on present price . The researchers of the Scientific and Technical Development Department of Shaoguan Smelter and other scientific research institutes have done a lot of work on the recovery of Ga from the granulated slag produced at Shaoguan Smelter. The four main processes for recovering Ga are as following :Chlorination volatilization process at high temperature;Only hydro metallurgical process for recovering Ga ;Melting with alkali- leaching process;Reduction smelting - electrolysis process .If chlorination volatilization process at high temperature is used to recover Ga from granulated slag , Ga may be collected in the dust , gallium of 98 % will be collected in the dust. The process is easier , and its energy consumption is lower . But the chlorinates and the products produced during chlorinating are corrosive , requiring equipments with bettercorrosion-resistance . 20% of chlorinate reports to the waste gas in the form of HC1 and CI2 during operation , causing pollution if no extra treatment is added.If only hydro-metallurgic process is used to recover Ga , the process flow-sheet is easier , the leaching rate is up to 70—80% . But the total recovery of gallium for the whole flow-sheet is low , only 45—51% . The acid consumption is high , and the iron content of leachate is high . The separation of gallium and iron is difficult , requiring high treatment cost .It is difficult to treat a large quantity of ferro-sulfate produced from the separation of gallium and iron . Therefore the leaching process with sulfuric acid is not reasonable technically and economically .If melting with alkali - leaching process is used to recover Ga , the leaching rate of gallium is up to 90% . But the gallium content of the sludge is too low , leading to too low gallium content of the leachate— only 60 mg/1 . The extraction flow-sheet becomes more difficult .If reduction smelting - electrolysis process is used to recover Ga , gallium will be collected in iron produced by using the grain iron method ( a reduction smelting method for iron ) The non-magnetic material produced during operation may be sold directly as cement-making material , the galliumand iron alloy will be melted and cast into anode plate for electrolyzing . The purity of pure iron produced during electrolyzing is more than 99.5% . Pure iron may be sold directly as magnetic material. The anode slime will be leached with alkali and be treated by electrowinning . Electrolytic gallium will be washed by acid and metallic gallium of 99.9% will be obtained .The technical and economic indices of reduction smelting -electrolysis process are better .The project has been proved to be feasible by industrial experiment . The small-scale experiment and pilot experiment of the reduction smelting-electrolysis process and the results obtained are mainly introduced in the paper .
Keywords/Search Tags:ISP slag, Iron smelting by reduction, Iron electrolysis, Separation Of gallium and iron, Gallium, Pure iron
PDF Full Text Request
Related items