Font Size: a A A

The Study On Techniques In Exploitation For The Dense Oil

Posted on:2010-09-19Degree:MasterType:Thesis
Country:ChinaCandidate:J Z WangFull Text:PDF
GTID:2121360278957828Subject:Oil and Natural Gas Engineering
Abstract/Summary:PDF Full Text Request
Extensively applied currently in the world of the dense oil heat adopt the development technique to swallow to vomit for the steam, that technique adopts to accept a rate lower, average only 15% ~s are 20%s.Compared with it, steam's getting rid of a technique can extend the steam spread radius and steam to spread to a physical volume effectively, and hide the oil end to adopt to accept a rate to raise to 40% above.Dense oil's hiding steam to get rid of to develop a successful key technique is an oil to hide the engineering research, the reasonable well net well's ising apart from,note to adopt parameter is a steam to get rid of to develop successful decision factor.Topic according to the concrete geology condition of the different and dense oil area piece of the optimization, draw lessons from similar oil-field steam to get rid of to develop a successful solid example at home and abroad, pass the number emulation research, make sure a dissimilarity to bury depth,different effectively under conditions such as thickness and the crude oil thing etc.s, the dense oil heat adopts a development of reasonable of the well net well be apart from,turn to get rid of opportune moment and note to adopt parameter etc. the steam get rid of the development implement condition.The topic passes domestic and international dense oil of investigation to develop the in general use sieving standard currently, initial optimization Daqing oil field suit the dense oil area piece that the steam gets rid of a development, experimenting through a mine with number to imitate a research, making sure Daqing oil field dense oil oil to hide steam to get rid of the sieving standard.Get the valid thickness 3.0 ms an above oil layer and can acquire better steam to get rid of development result in the meantime.Choose currently of kit tube the pillar is suitable for dense oil steam to get rid of the request that the heat adopts a development.Carried on the heat steam foam to adjust the section technique to resolve to note steam to mine process to flee in the vapor in the meantime the research of problem.Passes to experiment to think that method can resolve a vapor to flee a problem, but the term of validity is shorter, suiting lengthways peaceful noodles of the oil layer of partial adjustment.
Keywords/Search Tags:dense oil, the techniques in steam drive, Thermal recovery, Simulation
PDF Full Text Request
Related items