Font Size: a A A

The Building Technology And Installation Of Shengli Platform For Production And Workover

Posted on:2011-10-10Degree:MasterType:Thesis
Country:ChinaCandidate:P R LiuFull Text:PDF
GTID:2121360308990430Subject:Mechanical engineering
Abstract/Summary:PDF Full Text Request
In order to exploit the petroleum in the shallow water area in Shengli Oilfield,there need to install the steel platform. So it have to transport the platform into the water which need to install platform by barges firstly.Take integrated platform for production and workover treatment in Shengli Oilfield for example,The paper introduces the project profile of the platform.This article also places emphasis on the building technology of the central platform and the method statement of the upper central parts.This article introduces the structure of KD702 deck barge, and points out the importance of ships when we try to exploit oil in ocean at present. The analysis and calculation of deck, framework, backbone and overall stability are made according to Specification of Steel Ships'Entry-level and Construction. Structure steel will be chose according to the analysis and calculation of the structure of KD702 deck barge. After analyzing, we will know how to choose a shipping boat and choose right steel to make the ship.Towing stability of KD702 deck barge are made, when KD702 deck barge is empty, full and full as soon as freezing. And we know the secure range where the ship can work. Proper conclusions and advices are given for the security of this ship.The tonnage and outfitting number of KD702 deck barge are also made in this article.
Keywords/Search Tags:deck barge, structure of the ship, towing stability
PDF Full Text Request
Related items