Font Size: a A A

Preliminary Research Of Chongqing Rail Traffic Track Beam Bridge Construction Management System

Posted on:2012-01-26Degree:MasterType:Thesis
Country:ChinaCandidate:H TaiFull Text:PDF
GTID:2132330332497914Subject:Bridge and tunnel project
Abstract/Summary:PDF Full Text Request
Chongqing Rail Traffic Line 2 and Line 3 are the first time in the form of monorail transportation. With the acceptance of each section of the project, a lot of problems expose, for example, data collection is incomplete, document management is still in the manual search phase, and the construction of the rail girder bridge quality assessment is still in artificial management phase. This series of questions made the development of Chongqing rail transit bridge construction management system as a way to solve the problem.Through deep research, the major work completed includes:1,Carrying needs investigation and study on relevant departments of track beam bridge construction, determining the overall framework of the system and the function of various subsystems, carrying needs investigation mainly on construction technology management subsystem, schedule control subsystem, investment control subsystem, quality and safety control subsystem, engineering Supervision subsystem, system maintenance subsystem.2,Preliminary discussion on a hierarchy of quality assessment and a determination of evaluation indicators in track beam bridge construction management system.3,Through the comparison of domestic and foreign research status, we selected calculating method applying to the quality evaluation indicators weight of the track beam bridge construction, completed the construction of quality evaluation model of the track beam bridge.4,Completed system architecture design and interface design of each subsystem of the track beam bridge construction management.The above is the preliminary research of Chongqing track beam bridge construction management system, which provides a reference for track beam bridge construction management system development and improvement.
Keywords/Search Tags:Monorail Traffic, Track Beam Bridge, Construction Management System, Needs Analysis, Structure Hierarchical Division, Assessment Indicators, Evaluation Model
PDF Full Text Request
Related items