| With the development of economy, the energy shortage, become more and more serious, gradually become the bottleneck restricting the development of society, and to improve efficiency be imperative in the development of electric power industry. This paper studied the economic operation of hydropower station, in the premise of the quality of power supply safety, quality, reliableTo calculate the unit number and the combination of hydropower station, in order to achieve the utilization efficiency of higher. It has the important practical significance in promoting energy-saving emission reduction, quality and efficient today.This paper reviews recent methods for hydropower station economic operation, and discusses the advantages and disadvantages of these methods in practicePointed out that the genetic algorithm has great advantage in solving the problems.In this paper, take the Lancang River cascade hydropower stations in the Manwan Hydropower Station as an example, according to the requirement of power plant units measured working data and network load, analysis and Research on the optimization operation unit, genetic algorithm is used to calculate the output and distribution unit. From the calculated results, the genetic algorithm than the current power station scheduling improvements, and using the MATLAB as the computational tool, easy to operate, the method of calculating the actual operation of the power station has a very important practical significance. Objective To study the effects between peak and valley load of the water consumption... |