Case Study On Engineering Change Of Special Training Building Of Automobile

Posted on:2016-03-08Degree:MasterType:Thesis
Country:ChinaCandidate:P WangFull Text:PDF
GTID:2132330482968534Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
Engineering change is an important content of construction project contract management, any in the implementation of the project in different degree of change, it cannot make specific forecast in advance, and after the construction cannot be completely avoided, it throughout all stages of the whole project from design to construction process. Engineering change is affecting construction project schedule control, quality control and investment control of the key factors. Negative engineering change would increase the cost of projects, leading to longer construction period and reduce the production efficiency of the project, is not conducive to the contractor, the maintenance of mutual relationship between the owner and supervising engineer. Engineering change to complete the goal of construction of a reasonable and orderly have a positive impact, and improper management of engineering change will cause the project scope is out of control, thus to complete the goal of construction have disastrous consequences. Increased control and management of engineering change, timely specification to handle change and reduce the impact on the project, so as to realize the management goal of the contract.Through literature, the paper discusses the related theories and methods of engineering change were analyzed. And a car in Germany to promote sex loan projects the professional practical teaching building as an example, the case of change in the process of its construction background, change process, and the result of the change management is described. Two changes due to a variety of reasons are successful case management, performance to change the processing cycle is long, the change amount big, change cost overruns and contractors are not satisfied, cause a lot of difficult to solve the dispute and controversy. The article analyzes the reasons for the success of change management is not, put forward the corresponding improvement Suggestions. And true to the FIDIC contract in China should be, how to reasonable improvement change management method and other construction engineering construction projects in colleges and universities to think and discuss.
Keywords/Search Tags:Engineering change, FIDIC contracts, Change management, Change oversight
PDF Full Text Request
Related items