This text through overhauling how shorten constructiontechnology taken to research and analyse time limit for aproject to iron-smelting blast furnace, combine the instancesituation of project, has been made and organize each processto be woven in rationally, try one's best to strengthen thedegree of depth of prefabrication of different members of theknot in front of stopping the stove of the old blast furnace,in a situation that the hoisting machinery hoists ability toallow, strengthen the unit of prefabricating, parkconstruction stages after the stove make professional work poston the premise of ensuring the quality of products, securityparallel, three-dimensional constructing alternatelieses, incase of guaranteeing the intensity of structure of concrete,try one's best to reduce a series of measures, such as hoistingof the new blast furnace structure, installation time,etc.,thus shortenned the whole project time limit for a project. Andshorten economic benefits and social benefits that are producedof time limit for a project to analyse in using this technology,then has confirmed the leading position in the similar projectconstructs of this technology.
|