Font Size: a A A

Studies On Management Pattern Of The Eastern Route Project For South-to-North Water Diversion In The Jiangsu Section

Posted on:2006-06-12Degree:MasterType:Thesis
Country:ChinaCandidate:H ChangFull Text:PDF
GTID:2132360182456626Subject:Hydraulic engineering
Abstract/Summary:PDF Full Text Request
The S outh-to-North Water D iversion Project (SNWDP) i s a s trategic water infrastructure that aims to solve the shortage of water resources in north china. It is a national great decision-making for sustainable development of china, and the Eastern Route Project (ERP) started in 2003. Jiangsu SNWDP has distinct speciality. Management is the key point on how to exert resources arrangement function of SNWDP and achieve the anticipative water diversion objective of Jiangsu SNWDP. By analyzing and using for reference the successful experiences and academic research production of water diversion project management in domestic and overseas areas at present, according to the order of optimizing water resources arrangement and c haracteristic o f Ji angsu SNWDP, t he thesis d esigns t he m anagement p attern o f Ji angsu SNWDP, and studies its operational mode.Based on the management principle and objective of Jiangsu SNWDP, the thesis establishes its management framework and designs three management patterns and four modes. Through analyzing the anticipative management effect, scopes in point, advantages and disadvantages of each modes seriatim, the thesis confirms the recommended pattern. It makes framework refinement design, defines rights and duties of control level, execution level and participation level for the recommended pattern. According to the principles of planned water use, metered water use, contract water use, toll water use, it studies project operation for recommended pattern from four aspects, namely water supply plan, measure intensified, water supply contract, and water rate enacted. The thesis analyses and studies how to ensure water supply quality of Jiangsu SNWDP from three levels, including doing watershed protection, intensifying intermediate process, and establishing a long-term mechanism. It makes brief design for dispatching management applied system, studies emphases parts which may affect operation of the pattern in practice, also analyses dispatching optimization of Provincial boundary project management, pumping station management, and different water resources. Finally, the thesis studies relevant basal supports and development stratagems for the management of Jiangsu SNWDP.The research production of the thesis provides maneuverable reference p attern for future management of Jiangsu SNWDP. It also has practical meaning on optimizing water resources arrangement and achieving the anticipative water supply objective of SNWDP.
Keywords/Search Tags:South-to-North Water Diversion, in Jiangsu province, Project management, Pattern study
PDF Full Text Request
Related items