| Project quality is a size of characters satisfies with some laws, codes, technical standard, design files and the comprehensive demands to safe, use, economic and beauty. Project quality assessment is a key link to control the project quality. Project quality assessment and management is an important measurement in project quality control and from it, the detailed quality examination datum can be gotten. Because the hydropower project has many characteristics, such as complex construction condition, long construction period, the large number of information, difficult to management, it is very difficult to project quality management and assessment. As a wide use of computers and improvement of information management, quality assessment and management should be ruled and perfected.Based on the practice of hydropower project construction in Yunnan province, and prevail investigate of hydraulic and hydropower project construction quality assessment and management, the main problems existing in actual work are defined in this paper. Through the research on the theory and method of hydropower project quality control and management, the hydropower project quality assessment and management system is developed. In this system 《Hydraulic Hydroelectric project construction quality assessment table fill explain and demonstration》 is used as a criteria, to found the system frame which can show the dynamic assessment process of project quality. It consists of main system (project assessment) and three sub-systems (project report forms management, report forms output, standard data management). The system is written in Visual C++ and makes good use of Microsoftoffice Xp environment and resource.This system has four characters as follows:1. The version interface is man-machine conversation mainly, optional read-in multi windows, user-friendly interface, great efficiency, meets the characters of hydraulic hydroelectric project such as many working face and exigent working procedure.2. ((Hydraulic Hydroelectric project construction quality assessment table fill explain and demonstration}} is based to fill the tables of hydropower project construction quality assessment. It is standard, realizable and applicable.3. It forms the standard figures and tables as word file, which makes the project quality assessment work going on duly and convenient for keeping in the archives and reference.4. It has good extensionality to meet the requirement of various quality assessments for every type of hydropower project.The system test and project practice prove that the system can manage and control the hydropower project quality information timely and effectively, improve the quality management level greatly and promote the hydropower project construction quality management actively. |