Font Size: a A A

Development And Research Of Panshitou Reservoir In Henan Province Flood-dispatching System

Posted on:2007-10-08Degree:MasterType:Thesis
Country:ChinaCandidate:L X YangFull Text:PDF
GTID:2132360185976424Subject:Water Resources and Hydropower Engineering
Abstract/Summary:PDF Full Text Request
This paper study flood scheduling system of panshitou reservoir, which base on the real-time automatic subsystem of hydrologic data collection and transmission and the real-time flood forecasting system of Panshitou reservoir. We study scheduling model and exploit relevant software, and in the end perfect all automatism system.And offer a few of ways for scheduling system of panshitou reservoir and realize the optimized scheduling.Applying the progressive optimality algorithm arithmetic and dynamic programming arithmetic for panshitou reservoir, and realizing optimize scheduling. Based on Sqlserver2000 date-base, we exploit computer system of flood scheduling, it is easy to control for general operator.The main content and achievement of the paper are as follows:(1)According to the aim and demand of reservoir flood scheduling, analyzing and counting material of panshitou reservoir, such as design flood data, real-time flood data, reservoir information, characteristic lines and so on. Considering the combined action of peak flood and flood volume, flood frequency use analysis by synthesis method in computer software.(2) Based on conventional method and empirical conventional method, optional scheduling model apply to flood scheduling of panshitou reservoir. researching their theory and solving process, and analyzing merits and faults of various methods. the progressive optimality algorithm arithmetic and dynamic programming arithmetic adopt to panshitou reservoir, and realize the aim of optimize scheduling and economic...
Keywords/Search Tags:flood scheduling, computer system, scheduling model, dynamic planning method, optimal model
PDF Full Text Request
Related items