Font Size: a A A

Investment Audit Under The Model Of List Valuation On The Engineer Amount

Posted on:2007-09-09Degree:MasterType:Thesis
Country:ChinaCandidate:X F ZhangFull Text:PDF
GTID:2132360212968440Subject:Civil engineering
Abstract/Summary:PDF Full Text Request
The act of"Code of valuation with bill quantity of construction works"is a doubtless and historic change in the realm of the engineering price in our country. It will effect on every aspects of investment including invest audit.According to the new price mode , there will be a great difference between audit and quata mode of it. The text will inrtoduce the systematically elaborate the new contents and requirements under the mode of engineering quantity detailed list and emphasize the importance of effective inspection by investment audit under this mode.
Keywords/Search Tags:bill quantity fconstruction works, Investment Audit
PDF Full Text Request
Related items