| To fully utilize the existing terminals resources, Dalian Xinhai shipping a limited liability company (formerly Dalian Ports Corporation), intend Terminal 1, 2 and 3 berths upgrades, to be operated by the Dalian Maritime Holdings Ltd. Dalian Ports Corporation is now calling for Rolling Xianglujiao "Galaxy Prince" rotate then dock area. Because of the "Galaxy Prince" round bow door was alight, with a springboard straight berth, but do not have existing berths springboard berthing conditions. According to a limited liability company in Dalian Xinhai shipping berths transformation of the program, proposed a 30 m × 16 m barge, fixed at 1, 2, 3 berth in the north and in the provision of a car lighter springboard, thereby creating a floating piers to suit the "Galaxy Prince" round berth.This paper is the National Maritime Authority port project on navigation safety verification of the need for administrative requirements, which links environmental project analysis and feasibility studies, including the reasonableness of the project, the strength and stability of the barge, from the mooring berths on the method of optimization, and security, Terminal transformation of the existing pier near the security implications of the waters near the port and transform the existing terminal security implications, safety and control measures during the construction of the feasibility study. |