| We can see that china will vigorously develop the Expressway to meet the large and growing flow of people and goods movement needs from the overall planning of Chinese expressway within the coming period. In the construction of Expressway project, there are substantial risks and uncertainties .not only it needs a long time period building and construction but also it is involved in the construction and management of projects related to the large amount of investment. Therefore, in the management process of highway construction, these factors have a direct impact on the overall highway construction and affect the successful implementation of the project. How to identify and evaluate the risks in the construction is a great problem. We should take measures to control risk, the reduction and minimization of risks to save the construction hazards and losses in order to achieve successful completion of the highway construction projects. Highway projects builders are most concerned about these very important things.This paper is about the issues of Expressway construction project risk management. The full text is divided into six chapters.First of all, it introduced the overview of the highway construction project in china as well as the plan of the highway construction in the future. It introduced the purpose and the significance of this study .it also sets up some problems about this study to be solved .it introduced some methods this research paper.Then, it describes the basic theory of the risk. It gives the concept and the character of the risk as well as the meaning and Classification of the Risk. It gives basic theory of risk management according to the features of the Expressway and the development in and abroad. It introduced the project's basic risk management procedures.According to the theory and methods of highway construction projects, it gives the Classification of the construction of Expressway project life cycle at various stages. Then, in accordance with the identification method of the risk ,it gives a detailed identification of the uncertainties and various stages of the life cycle risks from the decision,the design,the construction and then it complete .On this basis, it also gives estimation and evaluation of the general method on the risk. According to the identifications of the risks, it gives a risk assessment and then the risk management measures. According to the actual situation of construction projects, it summarized six stages risk management suitable for features of the project.At chapter five, According to the study of Ji-Lai Expressway construction project risk management case, it focuses on the fuzzy comprehensive evaluation method in the application of risk assessment and risk management. It makes a model of multi-level fuzzy comprehensive evaluation construction of the highway construction project risk evaluation. It gives some details of the risk management measures from the road design stage and construction phase. It pointed out the good effects of Ji-LaiExpressway construction project risk management.Finally, the Paper presented the final conclusions and the research prospects of risk management. |