Font Size: a A A

Design And Realization Of Power Grid Improvement Project Of Fushan Power Supply Company

Posted on:2009-03-08Degree:MasterType:Thesis
Country:ChinaCandidate:Z Z WangFull Text:PDF
GTID:2132360242986687Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
According to the management mode and state of the power grid improvement project of Fushan Power Supply Company in Yantai, and based on the demand analysis, the main operation flow is completed, and the method for the power grid improvement project management information system designing and realization is put forward. Firstly, according to the requirement analysis, the designing goal, database and module of functions are established. The datasheets are divided into the following eight kinds: the datasheet of the basic data code, the datasheet of the authority management, the datasheet of material input and output and stock management, the datasheet of contract and the datasheet of statistics project, etc. Then, by analyzing and comparing the current empoldering tools, PowerBuilder6.5 and Oracle8.0.5 is selected for the former empoldering tool and the background database respectively, the power grid improvement project management system of C/S mode is developed, with the function being made up of a system maintenance module, a projects and material needs module, a contract management module, a material input and output management module, a material stock management module, a material cost management module, a provider module, an authority management module. Finally, by testing and improving the functions, an applied and effective high-voltage business expansion manage system is set up.
Keywords/Search Tags:Management information system, Power Supply Company, project management, Powerbuilder
PDF Full Text Request
Related items