Research On The Production Management And Key Technology Based On Agile Pattern

Posted on:2009-01-28Degree:MasterType:Thesis
Country:ChinaCandidate:X T ZhengFull Text:PDF
GTID:2132360245480525Subject:Mechanical Manufacturing and Automation
Abstract/Summary:PDF Full Text Request
Agile manufacture will be the main production mode of 21 century. It enhances the enterprise's competitive ability and makes the agility and rapid response to market's demand through the way of "competition-cooperation (coordination)". The change on the order task and the appearance of the emergent order task make the dynamics of the productive scheduling problem in workshop increase greatly, traditional production scheduling technology can not meet the demand of the agility of workshop, how to plan and schedule becomes the key issue to make the manufacture process smoothly and efficiently. And it is very important that the research on effective scheduling and optimization to improve productivity and reduce cost.On the base of analyse to the agile manufacture workshop' structure and operation characteristic and task scheduling flow, and the enterprise's operation flow, one kind of structure pattern of task planning system in agile workshop is presented and the function model of workshop scheduling system is established, and the author also program and make research in the system's function module.For Multiple Resource Constrained Job-shop Scheduling Problem(MRCJSP), the Multiple resource constrained programming model is established which considers resources' type changing and restraint influence in resources' available time, and the author designs and complete three optimized scheduling approach which base on heuristic,simulated annealing and mixed algorithm respectively.The heuristic optimization scheduling algorithm used in Job-Shop is designed which takes the maketime as the goal and introduces plan of the alternative process, and realizes the assignment and optimization of scheduling task based on the influence which the different rule make to the scheduling goal. It includes the scheduling method of single-rule and the multi-rules combination.The influence which single-rule and the multi-rules combination and process planning on the scheduling result of Multiple Resource Constrained Job-shop is analyzed in the paper.An another scheduling approach based on mixed algorithm combined with the dispatching rule and simulated annealing is presented, in which the new rule of coding and decoding are designed and adaptive factor is adopted to make probability of reducing the randomicity. The results show that mixed algorithm performs well for MRCJSP and prior to independent heuristic algorithm and simulated annealing algorithm on some performance indexes.As researched above, finished the enterprise's information system and treat the process management, produce scheduling, resource management as the core of the system. And the Java language and SQL have been used to design the module and operation flow of the system and realize the whole system. The running of this system shows the feasibility and validity of those scheduling approachs and the enterprise information solution system.
Keywords/Search Tags:Agile manufacture, Process management, job-shop scheduling, Optimized algorithm, MVC structure
PDF Full Text Request
Related items