The whole process supervisory is studied and practiced in the steel structure of Tianjin Trade & Shipping Service Center. From viewpoints of the project's background, project item conduction and total construction objective has been accomplished, and the main characteristics of the project are analyzed. The construction technique and quality control about principal part of steel structure is described. The measures and methods of quality control are stressed in the whole process. Profit experiences gained through the engineering supervisory practice are summarized. The thoughts and views of supervisory are summarized for future development.The establishment and management of supervisory organization system during the whole process are introduced. It's based on making an exhaustive study of the Contract of Tianjin Trade & Shipping Service Center's. The supervisory team is made sure in the range of supervisory works, supervisory organization system is established, personal responsibilities of the system is also set up. And at the same time, the appropriate supervisory procedure is laid down.Several measures have been applied to the engineering of steel components by factory-made and suspend-truss frame installation in construction site. In accordance with analyzing and researching achieved results above, the working principle of supervisory experiences can be concluded. That is: insisting on giving first place to predict, keeping a lookout in advance; insisting on tracing and supervision, monitoring control the Contractor execution of works in accordance with the examinational and approvable"construction management plan", strictly implementing the course control, checking program about personal, mechanical equipments, building materials, construction methods, environment etc., supervising and urging the Contractor carrying out the quality assure system , site seeing the critical parts working, finding out and correcting the defects promptly. Finished work acceptance should be perfect; the construction quality of solid mass must be conformed to the requirement of design drawings, technology codes and regulations. Finally a conclusion is given to steel structure design and factory-made component what is the main factor to achieve the project's goal completely; properly working out hoisting plan and utilizing theory and technology of progress schedule, taking the whole situation into account is a very important factor to shorten the construction period, which is based on thinking over the whole process of supervisory. Furthermore, a proposal is put forward for the promotion supervisory rival strength and realizing connection with international consultative service trades.
Keywords/Search Tags:Steel structure, suspend-truss frame, components factory-made and construction site erection, quality and schedule control, effects of supervisory
PDF Full Text Request
Related items