Font Size: a A A

Development And Excution Of Chinese 200MW Wind Energy Project

Posted on:2006-12-07Degree:MasterType:Thesis
Country:ChinaCandidate:Q DingFull Text:PDF
GTID:2179360182970695Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Wind energy is a kind of clean energy which is taken from nature, and it is also kind of endless renewable energy, the exploitation and utilization potential of wind energy is huge. With the coming mature of the wind energy technology, wind energy has become one of the most development prospect renewable energy. Construction of Wind farm has the practical meaning to the release the tough situation of supply of primary energy source, environment protection and promote the development of the local economic. Firstly the article analyses the development situation of wind energy in China, discusses the necessity of development of wind energy in China, especially discusses the importance of increasing the scale of single project and total scale of wind energy market. Issuing license for Wind energy is a kind of competition mechanism which is taken for the development of large wind farm, the article takes Jaingshu Province Dongda wind energy development project as example, made preliminary evaluation for the feasibility of 200MW licensed wind energy project on the basis of detail analysis. The evaluation includes: wind energy resource analysis, units sizing, constriction, operation, environment evaluation, economic technology evaluation and so on. The article describes the meaning and function of quality assurance and process control involved in the EPC general contracting for the construction of 200MW wind energy farm, and sets out the important control points and key procedure. In order to realize and increase the operation targets of 200MW wind energy farm, effective measures are raised out for scientific management, staff arrangement, technology training. A set of complete, scientific, advanced management modes is set up for operation management on the principle of scientific operation, optimized working procedure, minimum cost and highest working efficiency. Through the safety and high efficiency, orderly working organization make the wind energy power generation sets reaches best utilization efficiency and power output, make the management of 200MW wind farm reaches international advanced level.
Keywords/Search Tags:200MW wind energy project, feasibility, control, operation
PDF Full Text Request
Related items