Font Size: a A A

Study On Coordination Mechanism Of Interbasin Diversion Project

Posted on:2007-01-11Degree:MasterType:Thesis
Country:ChinaCandidate:J F ShenFull Text:PDF
GTID:2179360182988418Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
The interbasin diversion project is a complicated system engineering, and its construction and management involve a lot of complicated problems in many aspects. On the basis of analyzing the characteristic of interbasin diversion project, and relevant theoretical researches and practical experience at home and abroad, carrying on a deep discussion and study on a few some problems involving in the coordination mechanism of interbasin diversion project.The researches of coordination mechanism of interbasin diversion project come down to two major aspects. On one hand, it is water attribute of diversion project;on the other hand, is entity attribute. Through setting up the coordinating organization system, linking two of these attributes together organically, and taking discussion and researches separately. First, studying on the coordination of water yield in interbasin diversion project. Telling of, from theory angle, conflict issues and measures that should be taken involved during transfering water between the districts, to norm water transfering and water using. From quantitative angle, having analysises on the coordination of the water yield allocation among districts, and the use with the local water and transferred water. Then, proposing water resource dispose model, to promote effective operation of interbasin diversion project.Second, studying on the coordination of management within diversion project. According to the relevant theories of the modern enterprise system, combining the management characteristic of different property projects, and in defining the investment to share proportion , to confirm the relationship of principal-agent in managing. Setting up, encourage and restrain inclusive game model, to norm its management inside, and give play to and adjust the comprehensive benefit of interbasin diversin project.
Keywords/Search Tags:Interbasin, Diversion project, Coordination mechanism, Principal-agent
PDF Full Text Request
Related items