Font Size: a A A

The Line Balancing Research And Simulation Optimization Of Carpet Line C In LJ Company

Posted on:2015-04-13Degree:MasterType:Thesis
Country:ChinaCandidate:L P XiongFull Text:PDF
GTID:2181330452960471Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
LJ company is a professional production of auto parts enterprises. It gives the part of thehost plant directly supporting the production of automotive interior products. The mainproducts of Lin Jun have the floor carpet automotive interior products for automobileWith the rapid development of economy and the increase of people’s living standard,People also increase demand for cars. The car has gone from luxury to commuters commontool of ride instead of walk. Then the entire auto industry sales also reached a new height.Then the corresponding models of products also increased the production task.LJ company mainly produces automotive carpet trim, The C carpet models as a result ofsales rising gradually, The existing production line has been difficult to meet the productionrequirements, Need a lot of work overtime to corresponding. In order to reduce the productionline staff overload overtime, And in order to improve the C carpet production line capacity.Due to space limit and shortage of funds, Not another extension, also cannot modify otherproduction line, How to improve the existing production line capacity has become one of theproblems our company imminent.This thesis combined with the actual situation of the production line. Then use the thetheory and technique of production line balance and industrial engineering, Analysis theproduction line balancing rate of LJ company C carpet.Mark the whole process is morebalanced, Adjusting the load or workload of the process or station operation,Make the time ofeach work as far as possible to close or equal, Find the optimization breakthrough ofproduction line, Eliminate all kinds of waiting waste phenomenon finally, To achieve themaximum productivity. At the same time,Through the simulation analysis the different ofthe production line productivity between Before and after optimization. According to theanalysis of the final results to adjust the process layout of production. By combining theproduction line balance rate research analysis and simulation optimization, improved theanalysis of individual production line layout business ability,It’s a great help for future studyand work, At the same time, also reached the production line productivity improvement andThe cost reduction results.
Keywords/Search Tags:line Balancing, Industrial Engineering, auto parts
PDF Full Text Request
Related items