Font Size: a A A

Search The Way Of Worktop Line Process Optimize

Posted on:2015-01-01Degree:MasterType:Thesis
Country:ChinaCandidate:T K XuFull Text:PDF
GTID:2181330452963575Subject:Mechanical engineering
Abstract/Summary:PDF Full Text Request
To focus on the resourcing H company work top line productivity improvement, thewhole thesis discuss round this. Firstly introduce the work center of work topline,which include panel saw, cold press, CNC, edge-banding, trim, assembly,package. And also introduce process, cycle time, effect.Then to collect the data on site and analysis these data,to confirm whether thesedata could meet the requirement of customer TAKT time. And use bar chart tooling tofind bottle neck work center within them, resource of this bottle neck work center,find effective way to improve it. After try new way on line, to collect and analysistime data again, to confirm the whole production line is on balance.Finally Through calculating these data and WIP moving time between each twoclose work center to confirm how long the conveyor should be.The thesis also usevalue stream map to analysis the detail data and information. Then compare the cycletime and area on site to confirm the improvement and resource is correct. and theresult is what we needs.
Keywords/Search Tags:worksurface production line, process optimize, TAKT time balance, value stream map
PDF Full Text Request
Related items