Font Size: a A A

Research On Development Problem In Coal Transportation Of Huanghua Port

Posted on:2011-12-27Degree:MasterType:Thesis
Country:ChinaCandidate:Y LiuFull Text:PDF
GTID:2189330332968588Subject:Traffic and Transportation Engineering
Abstract/Summary:PDF Full Text Request
Our energy resources is abundant in coal and less in oil. Coal consumption is dominant the structure of energy consumption in the long time. The condition,which coal distribution,production and consumption patterns,have decided the general pattern of coal in west transport to east and railway and ship combined transportation. Huadong and Huanan is economic developed zone, the main zone of coal consumptions, and the primary destination of railway and ship combined transportation., which the amount of coal consumption is also increase. Shenhua company is the big company which coal production, transportation, sold, and power plant combined. According to the schematization of Shenhua company, the production of coal will be 5.59 hundred millions ton, and the railway transportation of Shenshuo and Suohuang will be two to 2.2 and 3.5 hundred millions ton, the shipment by way to port will be about 3.5 hundred millions ton, the way by Huanghua port will be 1.5 hundred millions ton in the year of 2015.Whether Huanghua port have the ability to achieve the target is very important to the development of Shenhua company. So the document will analyse the conditions of Huanghua port and pose the solutions to solve the difficulties.First, the large form of the coal industry is now the background, combined with the Huanghua Port in recent years, the actual development, Huanghua coal development on the external environment and internal conditions, objective assessment of the factors, and then make for the SWOT model, from the opportunities threats, strengths, weaknesses analysis, we come to SO, WO, ST, WT strategic combination.Secondly, in the capacity of Huanghua to measure, we find that now the main bottleneck in Huanghua Port Road capacity. Huanghua Port is also known to the existing equipment to expand production capacity, if not impossible to complete the Shenhua Group, the scale of future development requirements of the Huanghua Port, so to keep pace with the Shenhua Group, the port addition in strengthening the internal management of the second phase must be completed as soon as possible Phase III expansion and construction projects.Finally, according to the company future business plans Huanghua Port, and now the problems in running the port, made a number of advantages to reflect the integration of Shenhua, part of the model and can change the port operations to maximize customer profitability, and I hope through these methods enhance the image of the port, users won reputation.
Keywords/Search Tags:Huanghua port, SWOT model, Queuing theory, Coal Transportation, Development
PDF Full Text Request
Related items