Font Size: a A A

The Research On The Professional Operation Management System Of The Chinese Nuclear Power Stations

Posted on:2012-01-19Degree:MasterType:Thesis
Country:ChinaCandidate:J Q ShenFull Text:PDF
GTID:2189330335950527Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Nuclear energy as a new kinds of energy,it is emphasized by a lot of countries.From 1960 to now,the nuclear industry has been developing rapidly in some developed countries and districts.Until the end in 2010,there are 443 nuclear power assembly units in 32 countries and districts,its net electricity power is about 349063 MW.The number of it account for about 17% of all the net electricity production in the world,and there are 37 nuclear power assembly units have been construting in the world.We expect that it will increase the net electricity power 3128 MW in the near future.Until the end of 2010,there are 13 nuclear power assebbly units have been operationed commercially in our country,its capacity attain 1080 ten thousands. Account for 2.88% of all the world capacity(3.75 billion KW).We started 10 nuclear power assembly units in 2010,the number of which is under construction will be 28. All the capacity will be 3097 ten thousands KW,account for above 40% of the capacity in the world.The achievement of our nuclear power stations operation is quite good,the level of them is much higher day by day.the statics of WANO demostrate that the Chinese nuclear power stations are not only suitable the request of WANO,but also the figure attain the advanced level all over the world.The essay is mainly from the summarize of our nation's nuclear power stations profession operational management theory,entrust system management application and evaluate the nuclear safety management three aspects,detailed expound that how to construct our nation's nuclear power stations profession operational management,and embody the utilization PSA method to set the mathmathic model,calculate the economic loss of our CEFR nuclear power stations on not to generate electricity in per hour,and contrast the espenses between the nuclear power stations and the thermal power stations.the essay is based on the reality of the cefr operation engenering,by means of the conventional electricity generation corporion and the PWR profession operation models reality,by the image and verify method,controversal and research method,case research method,history research method,material research method and theory with reality method etc to explore the profession operational management model,continue exploring,making it more perfect,endeavor to applicate it in our commercial CAP-1400 and the new kind of nuclear power stations.
Keywords/Search Tags:CEFR, nuclear powerstations, nuclear safety, entrust system, operational Management, PSA applicant
PDF Full Text Request
Related items