The Research Of Project Method Construction To The Railway Construciton Engineering

Posted on:2007-09-16Degree:MasterType:Thesis
Country:ChinaCandidate:Z G JiaFull Text:PDF
GTID:2189360212460371Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
Project Method Construction is one kind of scientific management method, which can improve engineering investment efficiency and comprehensive effect through many resources optimization and dynamic management, based on the project manager responsibility-taking and economic contract.Since China opened, with the national economy developing, the fixed assets investment in becoming more and more, the construction industry meets a new situation for its future development. Especially China has joined the WTO organization and the corresponding requirement including our socialism marketing economy requirement, the requirement of the construction industry is getting more and more strict to quality, and the cost must be reducing, constructing process meets more uncertainty. For the great changes in the new construction environment, all the construction enterprises must reform the old construction management model, fortunately, the Project Method Construction should be an effect channel.As to the railway construction project, since its mass scale, design contents too much, it has some special features except general characters of the normal construction project like as much construct points, long construction line, implementation outside, strongly subject to the climates and geometrical surrounding, also involving many units, complexity of relationship, so during the railway construction, the enterprises must adjust the project contents and plans all the time. The complexity and dynamics is the most serious challenge to the railway construction project.The practices of the Project Method Construction implemented in the railway construction, proved this method has certainty effects in the railway construction. But old Project Method Construction never proposed some new idea, project management does some separately control to the schedule, cost and quality, no tight relation between them, cost measuring can't reflect the construction time schedule, on the contrary, the schedule measuring doesn't touch cost situation, so we need some systematical Project Method Construction...
Keywords/Search Tags:project method construction, earnest value methods, railway construction project, problem solving
PDF Full Text Request
Related items