Font Size: a A A

Risk Analysis And Contermeasure Research Confronted By General Contractor Of Construction

Posted on:2007-06-21Degree:MasterType:Thesis
Country:ChinaCandidate:X H MengFull Text:PDF
GTID:2189360212465132Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
In view of the market situation and macroscopic policies, after careful investigation and analyzing to construction cases, I concluded this topic, which subjects concern risks and related items (external and internal causes). From construction companies'organization structure, system, strategy, management, administration, finance, technology, environment, resource, market, policies, politics and industry, I have analyzed and approved the risks that construction firms are facing. During the course of studying risks, I make use of methods of risks investigation and mathematical statistics.I also analyzed the risks rate, risks influences and importance, meantime, I put forward a serious of easily controlled solutions aiming at dealing with risks. Above solutions are the fruits of combing theories with practices, most of them come from my own rich experience, It is helpful to provide construction companies with theories instruction of controlling risks.Through studying results about research of controlling risks (home and abroad), I find most of companies and peoples are aiming at studying one item or concentrating on project risks, for example, addressing risk from management angle or contract, project cost and some other simple item angle. Its disadvantage is non-system, which easily lead to not looking for reasons from enterprises systems and not pay enough attention to risks of systems (organization structures, system, strategy), So their solution are also not basing on internal causes but external ones. The fact is that internal causes sometimes play an important role even a basic role.This topic not only analyze the risks the construction firms are facing, but also offer solutions and provide a simple way of identifying and evaluating risks for construction companies.For the risk precaution, I put forward the idea of changing traditional risks management into the integration of management, especially emphasize the importance of set risks precaution mechanism.Construction companies, through making use of methods offered by this topic, analyze the risks in the light of practices of their own firms.After identifying and evaluating risks effectively, referring to solution my topic has mentioned, some risks precaution polices can be made accordantly.It is significant and important for construction companies to build risks precaution mechanism, reduce the potential risks rate, transfer the risks losses and make the biggest profits.
Keywords/Search Tags:general construction contract company, risks analyze, precaution policies
PDF Full Text Request
Related items