Font Size: a A A

Research On Project Management Mode Of Geophysical Prospecting For Petroleum Enterprise

Posted on:2007-08-27Degree:MasterType:Thesis
Country:ChinaCandidate:X S YaoFull Text:PDF
GTID:2189360212971906Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Along with the world economics development, the demand for energy is more and more pressing. And petroleum exploration, as the base of the national oil industry, must speed up unceasingly the exploration, enhances the efficiency, so as to resolve the contradiction between the petroleum supply and demandPetroleum Exploration has a great difference from many other enterprises, which has its own distinguishing features. Considering that written by Project Management Research Committee and the project particularity, the dissertation makes up the theoretic and analytic framework of Project Management Mode of Geophysical Prospecting for Petroleum Enterprise and put forward valuable referenced system info. The system info mainly includes: schedule controlling, quality controlling, cost controlling and risk controlling of petroleum enterprise. After establishing the theoretic analyze,the dissertation takes BGP's Seismic Prospecting for example.The dissertation proposes my own opinion of Project Management Mode of Geophysical Prospecting for Petroleum Enterprise, may be helpful to the later corresponding research work.
Keywords/Search Tags:Petroleum exploration, Project management, Project plan, Project implement
PDF Full Text Request
Related items