Font Size: a A A

Provincial Electric Power Design Institute Risk In The Context Of Separation Of Principal Industry And Secondary Industry

Posted on:2008-03-10Degree:MasterType:Thesis
Country:ChinaCandidate:Y D WuFull Text:PDF
GTID:2189360212991920Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
The arm of the subject is to do some researches of the province electric power institute of design how about answer business risk and the risk's variance which faced with the Chinese electric power enterprise's major works and the auxiliary works'separation.This subject consists of the risk 's notion and feature and the risk's variance which faced with the separation and the countermeasure of the risk.The first part mostly introduce the risk notion and characteristic, analyses the risk characteristic and the risk type of the province electric power institute of design. The second part is primarily study the risk's variance of the market risk, brain drain risk and financial risk .The third part study the countermeasure of the risk's variance , this part include past financing, investment activity keep away risk and muscle operating management activity keep away risk.
Keywords/Search Tags:the province electric power institute of design, risk, study
PDF Full Text Request
Related items