Font Size: a A A

The Post-evaluation Of High Fineness Super Twisted LCD Construction Project

Posted on:2008-05-02Degree:MasterType:Thesis
Country:ChinaCandidate:Y JiangFull Text:PDF
GTID:2189360215951972Subject:Technical Economics and Management
Abstract/Summary:PDF Full Text Request
The article mainly aimed at investment projects after evaluation of the theory and application of comprehensive and systematic analysis and exploration, in the market under the conditions of high-tech investment projects to be undertaken macro-control evaluation methodologies and indicator system. According to the project cycle theory and procedures for investment projects, after evaluation of the project investment is completed, Objective of the project, implementation process, effectiveness, relevance and impact of the full system analysis summing up both the positive and negative lessons that will allow the project to the decision-makers, managers and builders to learn more scientific and rational methods and strategies to improve decision-making, management and construction, to achieve greater efficiency and improve the investment purposes.This paper studies a high fineness super twisted nematic liquid crystal display construction projects after evaluation of the project is put into production three years later, The establishment of the project decision-making, design, construction and operation of the entire production process of conducting a systematic evaluation. The construction project after the main comparative evaluation, that is, after the commissioning of the project through the practical effect of the decision-making period with the expected goals, to find differences, analyze the causes and measures for improvement, and then sum up the experience and lessons.After the evaluation of the project from the following areas for evaluation:(1) LCD construction projects post-evaluation in the production process, Its main building, including LCD setting up projects after the decision-making phase of the evaluation, research and development phase of the post-evaluation, Project completion of the second phase of evaluation and project Dachanhou phase of the operation after the evaluation.(2) LCD construction projects post-evaluation of the financial benefits, it mainly refers to investment activities of the whole process of financial results after the evaluation. Analysis of the financial benefits realized, looking for the causes of the difference.(3) LCD construction projects post-evaluation about continued, the evaluation of major projects completed, the stated objectives can be sustained.(4) LCD construction projects post-evaluation about effection, analysis of the major projects in full development stage of its surrounding area in terms of technology, economic, social and cultural environment as a result of the influence and role.LCD construction projects after evaluation is a complex and systematic project. high-tech investment projects under the main factors, the paper focused on market forecasts, R & D and production operations management and financial aspects of benefits after evaluation studies.After the evaluation process through the project is to investigate and data access methods, a comprehensive understanding of all aspects of project information, and the basis upon evaluation form after the evaluation report. This paper describes the evaluation of the project after three main methods : statistical prediction, the logical framework, any contrast. This paper is of high fineness super twisted nematic liquid crystal display construction projects this specific case forecast and actual values Comparative analysis of the merits of the project. According to information gathered by field survey and the situation, the article mentioned above the theoretical foundation, focus on the post-project evaluation of the implementation procedures, process management, social and economic benefits of the project and the problems and risks were analyzed, and the project has made a comprehensive evaluation.As China's high-tech investment projects rapid growth, how to evaluate various theoretical and methodological reasonable, accurately applied to the evaluation of investment projects in the work, and to enhance the decision-making and management level, adoption of this analysis, will be invested in the future of construction projects the level of decision-making and management level of a certain reference value.The paper is divided into five chapters: The first chapter discusses the beginning of the 21st century, China's high-tech industries as well as the status of this paper, the background of significance.The second chapter introduces the theoretical of project after evaluating briefly.Mainly of two parts, the first evaluation of the project after the concept and content, This was followed by a brief account of the post-project evaluation methods.The third Chapter of this essay is to focus on sections of the project after evaluating the profile was described in detail, specific on the need for the project, background and overview; Analysis of market demand and the scale of construction; technical programs; personnel and implementation plans; economic analysis; After evaluation of the project's content analysis.The forth Chapter of this essay is the core chapters, detailing the item after the evaluation studies, introduced the project's decision-making process after evaluation; Business process evaluation; Post analyzing the economic impact assessment and evaluation.The fifth Chapter is the section of the above analysis, discussed on the basis of summing up the high-tech construction projects post-evaluation of the experience, advance some improvements, I hope to make a little help for some similar projects in the future.
Keywords/Search Tags:LCD, investment project, post-evaluation
PDF Full Text Request
Related items