The engineering construction project construction cycle islong. Money invested is large. The unpredictable influencefactors are many in the construction process. The engineeringconstruction participation all quarters including the owner, thecontractor, the material equipment supplier inevitable can faceeach kind of risk. At present, Joins World Trade Organization'srequest and the market economy behavior standard consummationalong with our country, Except dodges the risk using the law andthe administrative method, According to international convention,More adopts the project insurance and the project guaranteeeconomical method, Restrains the market all quarters main bodybehavior, Safeguard project quality, safety in production andcontract performance, In our country recent years, hasestablished the project guarantee and the project insurance riskmanagement system gradually guarantees the engineering projectthe smooth implementation. But in actual operation and movementprocess, contractor's participation is not specially high.This article in view of this phenomenon, constructs theenterprise risk management present situation to our countryengineering construction project in and the existence questionanalysis. The exposition establishes in our country with carrying out has the vital practical significance take the projectguarantee and the project insurance as the core risk managementsystem to the project risk. And through risk management theoryknowledge analysis and discussion, Unifies our country's currentnational condition, Embarks from the construction enterprise'sangle, Proposes in our country construction market establishmentand the consummation project guarantee and the project issurancesystem basic tentative plan with the policy suggestion. |