The study on the problem in the application of valuation mode of Bill of project quantities. Firstly, analyzing and studying three project cost modes:Cost Engineering system in America,Quantity Surveying system in Commonwealth of Nations such as Hong Kong and Accumulate Method of Measurement of Building Works in Japan . At the same time compare three project cost modes'sameness and differences. Pointing out we learn from three aspects . The mechanism of project contract management and assure .Information about project cost be issuance quickly and abroad .Matched environments need to be optimized .Secondly , compare the traditional valuation of quota mode and valuation with bill quantity of construction works and point out the advantages of the new valuation mode .Some problems need to be solved appear during the application of the method of valuation with bill quantity of construction works. These problems are following after . Bill of project valuation mode are understood deficiently. itself has some shortages. The problems in the process of invite public biding by Bill of project quantities. A lot of construction enterprises have no themselves quotas ,so they have some difficulties in quoting . Increasing workload because of reform out of step. Some problems in the process of reconnaissance and design . Problems in venture manage mechanism . Some tactics are put forward to these questions by the author. These tactics are following .Change conception quickly .Perfecting the ,criterion the process of bid and tender. Help the construction enterprise build themselves rations. Matched environments need to be optimized . Improving the quality of design in order to improve quality of the Bill of project quantities .Reinforcing venture management , perfecting the mechanism of venture management . |