| Currently, the railroad building system to provide the warm system reform just push forward gradually, provide warm welfare to the railroad officers and workers' residence and will change from dark repair to in winter clear repair, issue toward officers and workers directly to provide the warm expenses in winter, from provide the hot and warm unit to provide the warm unit price toward customer to take to adopt the warm fee according to the market;At the same time, Shi jia zhuang railroad building er duan markets to turn the operation also in the aggressive operation, Shi jia zhuang railroad building er duan face the important change that the lord assists the separation and assists the industry to change the system, can pass only for transport the main industry to provide of provide the warm service, and according to provide the warm area, quantity and correspond the unit price, according to the settlement that the market mode carry on the of unit. The Shi jia zhuang railroad building er duan existing providing warm cost control level lower, the average cost unit price is obviously high in provide the warm market unit price, with borrow to be thus provided for the warm cost management level to carry on management, the stone iron construct two the segments will result in loss in business, even talking not up from now on of development。In order to guarantee Shi jia zhuang railroad building er duan that developments to strengthen, must carry on providing the warm cost control effectively, make the business enterprise performance maximize.The Shi jia zhuang railroad building er duan carry on providing the warm cost control effectively, must analyze current provide the present condition of the warm cost control, find out to exist the problem and produce the reason of these problems. The Shi jia zhuang railroad building er duan be provided for warm cost control to has been follow to use the planned economy system under of controls method, the method is old, don't suit the stone iron to construct two segments actual。the Shi jia zhuang railroad building er duan used to follow the management system of use the planned economy, the traditional cost management and controls make business enterprise since lack the motive of providing warm cost control, also did not provide the pressure of the warm cost control. The production wastes with the original material, management fee...etc. seriously, be provided for warm cost to can not get to control completely. Combine the Shi jia zhuang railroad building er duan present condition and related theories that providing warm cost control, dividing the step establishment to providing warm cost control system featly.Provide the warm cost control to still be affect by the corporate culture, information system, the human resource equipment etc,Be therefore provided for the warm cost control system to build up hereafter, need to adopt to correspond the measure in above these aspects。Main purpose be the person is exhausted it use, the full transfer officers and workers providing warm cost control work of aggressive sex;Guide the cost management principle that the employee sets up the forerunner, make it approve the business enterprise to providing warm cost control measure, and participate actively among them;Perfect information system, make it better to check, control the work service for the cost.Believe to pass construct to the Shi jia zhuang railroad building er duan providing warm cost control system of research, will increase to manage to the business enterprise the peaceful economic performance in water rises positive propulsion function, also provide warm cost control for the railroad business enterprise of the of the same kind type to rise to certainly draw lessons from the function. |